NEC Article 250 — grounding and bonding

The most-tested PE blueprint topic. 250.4(A) five general requirements (earth is NOT an effective ground-fault current path). 250.20 which AC systems must be grounded. 250.50/52 grounding electrode system. Table 250.66 GEC sizing + rod/pipe/plate reduction. 250.118/Table 250.122 EGC types + sizing. 250.28/96/102 bonding. All values verified against NEC 2020.

Senior ~13 min

Step 1 — Why ground and bond: the five general requirements of 250.4(A)

0.55×
step part section

Reference notes

NEC Article 250 covers grounding and bonding — the most-tested topic on the PE Electrical / Power exam blueprint, and the foundation of every safe electrical installation. Use Next → to walk through the five general requirements (250.4), which AC systems must be grounded (250.20), the grounding electrode system (250.50–66), equipment grounding conductors (250.118–122), and bonding (250.28, 250.96, 250.102).

The five general requirements (250.4(A))

  1. Electrical System Grounding — grounded systems are connected to earth to limit voltage from lightning, line surges, or unintentional contact with higher-voltage lines, and to stabilize voltage to earth during normal operation.
  2. Grounding of Electrical Equipment — normally non-current-carrying conductive materials (enclosures, raceways) shall be connected to earth to limit voltage to ground.
  3. Bonding of Electrical Equipment — those same materials shall be bonded together and to the supply source so a ground fault has an effective return path.
  4. Bonding of Electrically Conductive Materials — non-current-carrying materials likely to become energized (water pipes, structural steel, ductwork) shall be bonded back to the supply source.
  5. Effective Ground-Fault Current Path — the path must be a low-impedance circuit that facilitates overcurrent device operation. Earth shall not be considered an effective ground-fault current path. This is the single most misunderstood rule in the NEC.
Grounding ≠ bonding. Grounding connects to earth (limits voltage). Bonding connects metal parts together (creates the fault current path). Both are required; neither alone is sufficient.

Which AC systems must be grounded (250.20)

AC systems 50 V – 1000 V must be grounded if any of these apply (250.20(B)):

Other systems may be grounded (e.g. corner-grounded delta). Three-phase 3-wire ungrounded delta is a common exception — used historically in industrial plants where a single ground fault should not trip the system.

The grounding electrode system (250.50, 250.52)

At each building or structure, all grounding electrodes that are present must be bonded together to form the grounding electrode system (250.50). Per 250.52(A), the recognized electrode types are:

  1. Metal underground water pipe — must contact earth for ≥ 10 ft (3.0 m)
  2. Metal in-ground support structure (piling, casing) — ≥ 10 ft
  3. Concrete-encased electrode ("Ufer ground") — ≥ 20 ft of bare rebar (≥ ½″ dia) or 4 AWG bare Cu, in concrete with ≥ 2″ cover, in direct contact with earth
  4. Ground ring — ≥ 20 ft of bare Cu ≥ 2 AWG, encircling the building
  5. Rod and pipe electrodes — ≥ 8 ft (2.44 m); rods ≥ ⅝″ dia if not listed
  6. Other listed electrodes
  7. Plate electrodes — expose ≥ 2 ft² to soil; ≥ ¼″ thick iron/steel, ≥ 0.06″ thick non-ferrous

Sizing the GEC — Table 250.66

The grounding electrode conductor is sized by the largest ungrounded service conductor:

Service Cu (or Al)Min GEC Cu (Al)
2 AWG or smaller (1/0 or smaller)8 AWG (6 AWG)
1 – 1/0 (2/0 – 3/0)6 AWG (4 AWG)
2/0 – 3/0 (4/0 – 250 kcmil)4 AWG (2 AWG)
Over 3/0 – 350 (Over 250 – 500)2 AWG (1/0)
Over 350 – 600 (Over 500 – 900)1/0 (3/0)
Over 600 – 1100 (Over 900 – 1750)2/0 (4/0)
Over 1100 (Over 1750)3/0 (250 kcmil)

Important reductions (250.66(A)–(C)):

Equipment grounding conductors (250.118, Table 250.122)

The EGC is the fault-return path from equipment back to the service grounded conductor. 250.118 lists 14 acceptable types — the most common:

Wire-type EGC sizing — Table 250.122, indexed by overcurrent device rating:

OCPD rating (A)Min Cu EGCMin Al EGC
1514 AWG12 AWG
2012 AWG10 AWG
6010 AWG8 AWG
1008 AWG6 AWG
2006 AWG4 AWG
4003 AWG1 AWG
8001/03/0
12003/0250 kcmil

Bonding (250.28, 250.96, 250.102)

Take-away. Grounding limits voltage; bonding creates the fault path. Earth is NOT an effective ground-fault current path. AC systems ≤ 150 V to ground must be grounded. All electrodes present must be bonded together into the grounding electrode system. GEC sized by largest ungrounded service conductor (Table 250.66) with reductions for rod/pipe/plate (6 AWG Cu max) and concrete-encased (4 AWG Cu max). EGC sized by overcurrent device rating (Table 250.122). Main bonding jumper at the service is THE critical conductor that establishes the effective ground-fault current path back to the source.

Source

All values, table extracts, and section references in this lesson are verified against NFPA 70 — National Electrical Code, 2020 Edition, Article 250 (Grounding and Bonding). Where exam questions reference newer editions (2023 / 2026), check Article 250 for amendments — the structure remains largely the same but specific table values can shift edition-to-edition.